George ties up whaleboat rigs for winter storage. |
Whaleboat sail hanging out to dry thoroughly before being stored. |
Inside the shop, however, there are boats and there is an increasing level of activity. We are gearing up for the student boatbuilding program, and expect that soon there will be as many as four or five small craft under construction by students and their advisers. The front half of the shop has been cleared for the students, a special tool cabinet and a safety equipment locker have been installed, lofting boards have gotten a new coat of white paint, and we have begun to hear young animated voices over the din of shop machinery.
Steve built a tool cabinet for the student boatbuilding programs. |
Lee and Steve plane cedar to 1/2 inch thickness for deck boards. |
The new kingplank is ready for installation. |
Volunteers John and Bob fasten a new frame to the sheer clamp. |
Lots of new frames in place and fastened. |
Varnish, sand, varnish, sand, varnish, sand . . . |
Steve, Charles, and Jeff plan the move of Lagniappe into the shop. |
In position next to Misleading Lady. |
The lead ballast being jacked up into position. |
The boat looks nice and simple.